Manufacturing and Assembling Gas Water Heaters
- Production line length 30 meter
- Productivity 200 pieces/shift (8 hours shift)
Testing capability for calculating:
- Estimate gas consumption
- Estimate gas pressure.
- Gas flow rate.
- Water outlet flow rate.
- Water Inlet pressure.
- Inlet and Outlet water temperature.
- Heat exchanger Leakage test
Available Feeding industries for the following G.W.H parts:
- Exhaust cap using dies, presses and spot welding.
- Heat exchanger parts using dies and presses.
- Front and back covers using dies and presses.
- Internal supports using dies and presses